« Water System Getting Flushed / Electric Company Begins / 1st Snow | Main | 2nd Day of Water Work Begins »
Tuesday
27Oct2009

Pictures from Saturday, Oct. 24. Water Installation

All of the pipe got laid today in one very long day.  Thank you to the folks at GMC Construction who really gifted us greatly.  We are appreciative.  This coming week we should have a pressure test at some point.  But, really, most of the water stuff is done.

And we can't thank Ed Gillen enough.  This is a guy who really took us under his wing and made this happen.  He blessed us tremendously.

SEE MORE PICTURES HERE